Product Description
Product Name |
IFAN OEM Water Supply Plastic PVC Pipe Cream ASTM 2846 CPVC Pipe |
Color |
White Or Customized Welcome |
Size(mm) |
1/2"-2'' |
Standard |
ASTM |
Package |
IFAN Package |
Connection |
CPVC Glue |
OEM&ODM |
Support |
Sample |
Free Sample |
Company Profile
Certifications
Why Choose Us
Packaging & Shipping
FAQ
1.Q: Are you a manufacture or trading company?
A: Yes. we're professional manufacture in China,and have been in this field for more than 30 years.
2.Q: lt is possible to get samples from your factory?
A: Yes. free samples will be sent if needed, but thefreight can be negotiated or chargeable, it will berefunded after confirmation of the order.
3. Q:What is CPVC pipe?
A:CPVC pipe is a type of plastic pipe used to transport high temperature fluids. Its full name is Chlorinated polyvinyl chloride pipe (Chlorinated polyvinyl chloride pipe), also known as dichloride pipe.
4. Q: What are the advantages of CPVC pipe?
A: High temperature stability, corrosion resistance, high strength, energy saving and consumption reduction, safety and sanitation.
5. Q: How are CPVC pipes connected?
A: 1. Preparation: Before connecting, you need to prepare the required materials and tools, including CPVC pipes, joints (elbows, tees, straight-throughs, etc.), pipe cutters, heat guns, CPVC welding materials, etc.
2. Cutting: Use a pipe cutter to cut the CPVC pipe to the required length. Pay attention to ensure that the end surface of the pipe is smooth and flat without burrs and cracks.
3. Cleaning: Clean the end faces of pipes and joints with detergent to ensure that the joints are clean and dust-free, so as not to affect the quality of the connection.
4. Splicing: Insert the CPVC pipes and joints into the heat gun and heat them separately until their temperature reaches 260°C~290°C, then splice them together and keep the connection until the cooling is complete.
5. Fixing: After the connection is completed, use the pipe clamp to fix the connection part in order to ensure the quality of the connection and avoid loosening or slipping.
6. Inspection: After the connection is completed, it is necessary to inspect to see if there is any water leakage or leakage, and repair it immediately if there is a problem.